Cadence
Projects
Commercial

DUO, Central Park

Sydney


The Four Points by Sheraton Hotel project is a 4.5 star hotel located in the heart of Central Park which forms the final piece of the significant urban renewal project in Chippendale by joint ventures Frasers Property Australia and Sekisui House. The hotel comprises of 297 rooms, a bar and lounge with an outdoor terrace, a restaurant and nearly 550 square metres of function space.

 

The hotel forms part of the fifth and final stage of the urban regeneration project on the site of the Old Kent Brewery near Central Station and across Broadway from the University of Technology Sydney.

 

Cadence Australia has been engaged to provide project management services and act as the client's representative for the project.

 

Australian Technology Park

Sydney

 

Cadence Australia was engaged by UrbanGrowth NSW Development Corporation to provide project management services for the subdivision of Australian Technology Park. The services required the management of various consultants and investigations, managing the creation of the lot envelopes, the creation and amendment of numerous easements, coordination and management of all stakeholders, and other associated project management services.

Ark

North Sydney

 

Ark is a commercial property prominently located in North Sydney’s CBD. The development was integrated into the heritage precinct with expansive views across the Sydney Harbour, Sydney City and the Blue mountains.

 

The 19 storey building delivered approximately 28,500sqm of A-grade contemporary office accommodation with a 5-star ABGR and a 6-star Green star rating. An 'art wall' stretching along Mount Street from the public forecourt provides a link between the building and the rich history of the area.

 

Incorporated into the Ark design are a number of ESD principles, with a focus on energy efficiency, technological advancement and green credentials.

 

Cadence Australia was engaged to provide project management services for the construction phase of the project.

 

Click here to view the Financial Review Article (29 April 2010) »

Workplace6

Pyrmont

 

Located in the inner city suburb of Pyrmont on a waterfront parcel of land known as Darling Island, Workplace6 is Sydney’s first 6 Star Green Star building as certified under the Green Building Council of Australia Rating. The project represents the third stage of the Sydney Harbour Foreshore Authority's Darling Island Master Plan.

 

This 6 storey commercial office building provides approximately 18,000 square meters of office space with a typical floor plate area of 3,500 m², putting it amongst the largest available in the Sydney Commercial sector. Construction of the building incorporated a number of Environmentally Sustainable Design (ESD) elements to promote natural light, clean air, water conservation, reduced emissions and energy efficiency. Along with a 6 Star Green Star rating, a 5 Star Australian Building Greenhouse Rating (ABGR) was achieved.

 

Workplace6 was a joint development venture between The GPT Group and Citta Property Group. Cadence Australia worked in conjunction with The Sydney Harbour Foreshore Authority in converting the development from Masterplan concept to development consent. Cadence Australia provided project management services to The GPT Group who took ownership of the building upon completion. The GPT Group's aim was to provide tenants with commercial office space incorporating key ESD initiatives and also provide tenants with the opportunity to incorporate Corporate Social Responsibility into their work culture.

163 Castlereagh Street

Sydney CBD

 

The 163 Castlereagh Street development is a Sydney CBD project involving the consolidation of 5 existing properties and design and construction of a 43-level premium grade office tower.

 

The project delivered  60,000m² of premium office space to the CBD with an ABGR rating of 5 and 5-star Green Star Rating and provided a through – site link with retail and open space areas between Pitt and Castlereagh Streets.

 

Cadence Australia were engaged to provide project management services for the delivery of the design and tender phases of the project. Cadence Australia's role included client and stakeholder liaison and engaging and managing the consultant teams.

545 Queen Street

Brisbane CBD

 

The General Property Trust (GPT) redeveloped a B-Grade commercial building in Brisbane CBD to create an A-Grade commercial building with 4.5 star ABGR and 4 star Green Star Rating.

 

The building's refurbishment extended the floor plates from 6,200sqm to 13,200sqm over ten levels, including 420sqm of new ground floor retail and an additional 101 car spaces. There is now a mix of large and medium sized floor plates drawing on natural light with both CBD and Brisbane River views.

 

As the Owner's Representative, Cadence Australia was responsible for ensuring all GPT's objectives were satisfactorily achieved in a timely manner, in particular, providing GPT with specific design and construction advice.

259 George Street

Sydney CBD

 

This CBD building underwent a major refurbishment programme comprising 22,000m² of commercial offices and a 5,000m² retail and food court podium.

 

Cadence Australia was appointed by Colonial First State Property to provide a comprehensive range of project management services, from concept design through to design development, construction and handover.

 

The project involved extensive demolition and structural works to the podium levels to accommodate the new retail and food court areas.

 

The building remained partially tenanted during the refurbishment process resulting in a range of complex staging and programming requirements for the project. Cadence Australia worked closely with Colonial First State Property, the building manager and tenants to deliver a positive outcome for all stakeholders.

1 Innovation Road

North Ryde

 

Located at Macquarie University Research Park, approximately 14 kms from the Sydney CBD, this project is directly opposite Macquarie Shopping Centre and the main bus interchange. It is also only metres from the Macquarie University railway station for access to the Northern Line.

 

The 1 Innovation Road building was rated a 5 Green Star commercial building. It includes 10,000 sqm of office space over 5 levels with a curtain wall glass façade, a metal louvre system, a full height atrium throughout the five storeys of the building provides an impressive feature as does the lobby with water feature.

 

As one of Macquarie Park's A-Grade office buildings, it has good proximity to shops and restaurants, abundant parking and both rail and bus public transport.

 

The project was occupied by one tenant "Nortel" and the works included their office fitout with level 3 being made good to an open plan configuration. The complex nature of the contract between four parties, being the D&C Contractor, Dexus, Tenant, and the Landowner, made for a complex process of approvals and contract administration. As Superintendent for Dexus, Cadence Australia’s role required that the parties complied with the many deeds and covenants that were part of the Heads of Agreement as well as compliance with a design that the three stakeholders, Dexus, Nortel and the Landowner (Macquarie University) had signed off on.

 


60 Margaret Street

Sydney CBD

 

This iconic building is situated in the heart of the Sydney CBD and comprises 36 levels of office accommodation and three levels of retailing with direct access to Wynyard Railway Station and Bus Terminal. Developed in 1980, the complex has been progressively refurbished.

 

Cadence Australia were commissioned to manage the design process for the Grade A office refurbishment of the existing tower floors.

83 Clarence Street

Sydney CBD

 

83 Clarence Street is an A Grade 22 level office tower within the CBD. The project included the complete upgrade of the entry lobby including the base building upgrade of an existing retail tenancy, access and security upgrade of basement car park entry, rolling floor refurbishment including the foyer refurbishment conducted whist tenants were in occupation.

 

Major services upgrade, including the chilled water and condenser water systems, new plant room, new BMCS system, new security system and the upgrade and refurbishment of all the low-rise and high-rise lifts. It also included the refurbishment of all toilets and services to the toilets, installation of a standby generator and replacement of the cooling towers.

 

Cadence Australia was engaged to project manage the refurbishment of the entire podium of the building from its initial conception through to construction completion.

141 Walker Street

North Sydney

 

141 Walker Street is a prominent A Grade 23 level office tower within the North Sydney CBD. The refurbishment works involved; the complete upgrade of the entry lobby including the creation of new retail premises, base building upgrade and floor plate extension of the first floor commercial tenancy, base building upgrade of mezzanine level retail and commercial tenancies, upgrade of the public domain, construction of a new tenancy and its associated base building fitout to accommodate a childcare centre, and the complete upgrade of all tower lifts.

 

Cadence Australia was engaged to project manage the refurbishment of the entire podium of the building from its initial conception through to construction completion.