Law Courts Recovery Project

Sydney


The Law Courts Building houses the Supreme Court of NSW, Federal Court of Australia, and High Court of Australia. This project included refurbishment works to three levels of the Law Courts Building due to water-damage sustained following a burst water pipe in late 2017. The significant recovery work included high-end level fitout works including replacement of timber joinery to the administrative areas and private chambers of Supreme Court personnel, and replacement of timber panels to Law Courts Building lobby, all carried out within a live building environment.

 

The refurbishment works were completed with great consideration for the on-going operation of the Law Courts Building, working out-of-hours to eliminate disruption to court proceedings, yet simultaneously working to meet a strict deadline so the displaced tenants could return as soon as possible.

 

Cadence Australia was engaged by NSW Department of Justice as the Principal's Authorised Person to provide project management services throughout the delivery of the refurbishment works.

 

L30 Senex Energy Fit out

Brisbane QLD


Senex relocated their operational staff onto L31 at 180 Brisbane in 2018. The L30 project involved the design and construction of Senex's 'front of house' facilities including a professionally presented reception area, a boardroom, dedicated meeting rooms, flexible training spaces as well as open plan collaboration spaces and a kitchen / café space for employees.


The construction works were delivered under a traditional procurement methodology with the furniture and AV equipment separately procured and installed by the Client.


Cadence Australia was engaged to provide Project Management and Superintendent Services.

Surry Hills Children's Court

Sydney


The Surry Hills Children's Court project involved the restoration of an existing heritage courthouse, which was designed by Architect Walter Liberty Vernon and completed in 1911. The restoration of the existing court house included conservation and treatment of existing facades and internal brickwork walls and the construction of four new courtrooms within the new three-level extension. The basis of the contract was construct only, therefore extensive coordination between the Contractor, Architect & Project Manager was required to achieve the desired outcome for the Client.

 

Cadence Australia was engaged by NSW Department of Justice as the Principal's Approved Person to administer the GC21 Contract.

 

The unique challenges for this project were the retention and protection requirements of the heritage building and the need for robust stakeholder management.

 

FACS Fitout

Batemans Bay NSW


To service the expanded needs of the local community, NSW Family and Community Services (FACS) acquired a new premise in Batemans Bay. Cadence Australia provided Project Management Services for the associated fitout works. The project included the development of a project programme, procurement and engagement of the consultant team, design development and documentation, tendering for the Construction Contractor, contract administration during construction and stakeholder liaison.

FACS Fitout

Coniston NSW


Cadence Australia provided Project Management Services to the NSW Family and Community Services (FACS), Coniston branch for their fitout works. The project involved demolition, refurbishment and the upgrading of existing reception interview booths to meet the required safety and security standards. The office remained operational whilst the project is being completed and had a strict timeframe to minimise the impact of any disruption.

OCG Fitout

Strawberry Hills


The Office of Children's Guardian fitout works (approx. 1,600sqm) incorporated the demolition of existing partitions to create an open plan workspace and new fitout works including the upgrade of essential services to suit the new floor plan, new breakout and tea room facilities, new offices, collaboration areas, workstations and installation of an audio-visual system.

 

Cadence Australia was engaged for the primary deliverable of end-to-end client-side project management including design management, tender assessment, contract management, sourcing of quote and fee proposals, certification, financial tracking, and co-ordination of the physical relocation from the existing office to the new office. Due to the adjacent tenancy, the office remains operational during the construction works and this adds the complexity of working in a functional/live building environment.

 

JIRT Gosford Fitout - Level 5, 231-237 Mann Street

Gosford, NSW

 

The NSW Department of Family and Community Services (FACS) currently maintain various teams across different locations within NSW. Due to the consolidation of their various teams across different locations, FACS identified a series of fitouts to their existing tenancies that required refurbishment. One such Gosford based location required a new fitout to accommodate NSW Police, NSW Health and FACS in a new split tenancy floor plan.


Cadence Australia provided project management services to manage and accommodate for two separate client bodies (NSW Police, FACS/NSW Health) under one project title. Cadence Australia's specific objective was to provide management and administrative support to FACS to enhance the delivery of the services while minimising WHS and project risks during the design phase.

FACS CPH Office Fit Out

Sydney

 

NSW Family and Community Services (FACS) occupies all of 23-31 Moore Street, Liverpool. The project required the full refurbishment of levels 4 and 5 to allow the relocation and consolidation of staff from other Sydney FACS offices in the Sydney CBD and Parramatta. Due to the facility accommodating a 24/7 call centre, works were required to be completed under a very strict timeframe to minimise business disruption.

 

Cadence Australia was appointed as Project Manager in order to deliver end-to-end client-side project management. This included change management, design management, tender assessment, contract management, sourcing of quote and fee proposals, certification, financial tracking and co-ordination of the physical relocation to Liverpool. With effective and efficient management this project was successfully completed whilst working in a functional/live building environment.

 

FACS HCC Office Fit Out

Sydney

 

NSW Family and Community Services (FACS) occupies all of 23-31 Moore Street, Liverpool. The project involved the fit out of the level 3 offices to accommodate 135 staff across approximately 120sqm. These works allowed for the relocation and consolidation of staff from other Sydney FACS offices in the Sydney CBD and Parramatta. Due to the facility accommodating a 24/7 call centre, works were required to be completed in a strict time frame to minimise business disruption.

 

Cadence Australia was selected as Project Manager in order to deliver end-to-end client-side project management including include change management, design management, tender assessment, contract management, sourcing of quote and fee proposals, certification, financial tracking and co-ordination of the physical relocation to Liverpool. With active and well-organised management this project was successfully completed whilst working in a functional/live building environment.

 

Novion New Premises Office Fitout

Sydney CBD

 

Novion (previously CFX) relocated to new premises in the Sydney CBD as part of its restructure. Cadence Australia was engaged to undertake the project management of the fitout. The work included development of project programming and budget, establishment of a consultant team, design development and documentation, tendering for a Design and Construct Contractor, contract administration during construction, and liaison with miscellaneous stakeholders throughout, to procure and complete a premium grade commercial fitout on a single floor in one of Sydney’s most iconic addresses.

 

Moss Vale & Port Kembla Courthouses

Moss Vale & Port Kembla

 

Cadence Australia was engaged as the Project Manager for the refurbishment and compliance upgrade to the Building Code of Australia and the Disabilities Discrimination Act. The Contractor was procured via a Design & Construct form of contract with the project.

 

Doltone House, Jones Bay Wharf

Pyrmont

 

Doltone House is a premium function centre and restaurant with a capacity to comfortably seat 800 guests. Cadence Australia managed the conversion of this heritage listed iconic Sydney harbourside structure to ensure the function centre retained the existing character of the Jones Bay wharf building. During this time, Cadence was involved and embedded with the Tier 1 constructor and had continual dealings with the joint venture developer, whilst concurrently working with the tenant to ensure their expectations and requirements were met to deliver this state of the art facility.

259 George Street

Sydney CBD

 

259 George Street is a unique building located in the heart of the Sydney CBD. Constructed in the 1970's this iconic building underwent an extensive internal refit of 23 floors comprising 22,000m2 of commercial offices and a 5,000m2 retail and food court podium. The project achieved a PCA A Grade rating and 4 Star NABERS rating. Cadence Australia was engaged to provide project management services throughout the duration of the works.